Choking depressurization manifold of well control equipment
product Description
Main technical parameters
● Working pressureMPa: 21、35、70、105、140;
● Main diameter(mm): 103、78、65、52;
● Working temperature(℃): P~U(-29℃~121℃), L~U(-46℃~121℃)
● Working media:oil, natural gas, mud, reflux fluid
● Meterial grade: DD、EE、FF、HH
● Product specification level: PSL3、PSL3G、PSL4
● Performance requirement: PR1
● Structure: (6 in 6 out、6 in 5 out、4in 4 out)
● Underframe: bench-top skid
Innovative choke relief manifold, a cutting-edge solution designed to improve the safety and efficiency of oil and gas operations. This revolutionary product is designed to meet the critical need for reliable, effective pressure control during well workover and production processes.
Choke and pressure relief manifolds are an important part of managing well pressure and reducing the risk of blowouts, overpressure conditions and other hazardous conditions. It is engineered to withstand the rigors of offshore and onshore environments, giving operators peace of mind and confidence to effectively manage well control operations.
Our choke manifolds and choke pressurization manifolds are equipped with advanced features to provide superior performance and versatility. The compact and lightweight design facilitates installation and operation, while the rugged construction ensures long-term durability and reliability. The choke pressurization manifold is also equipped with precision control valves and instrumentation, allowing operators to accurately adjust and monitor pressure levels.
One of the main advantages of our choke pressure relief manifold is its ability to simplify operation and increase safety. By effectively controlling pressure levels, it helps mitigate the risks associated with well control and intervention activities, protecting personnel and assets from potential harm.
Our experienced team of engineers and industry experts carefully design and test throttling and pressure reducing manifolds to meet the highest quality and performance standards.
1,Pressure testing
2,Sealing testing
3,ICAS, CMA, CNAS third-part service
Wellhead equipment and Christmas tree could be used onshore and offshore, for oil and gas well